Bajaj, D, Oluwoye, J O and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(04), 363-9.

  • Type: Journal Article
  • Keywords: contracting; estimating; risk identification; tendering
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461997372917
  • Abstract:

    This study addresses the process of risk identification at the tendering and estimating stage, which is the first stage of the risk management process, and for the risk management process be of benefit and for the project objectives to be achieved, the risk identification stage should be very detailed and thorough. The aim of this study is to identify, investigate and evaluate the process of risk identification at the tendering and estimating stage for construction contractors in the NSW region. The data for this were collected during the months of December ’94 and January ’95 using a sample survey of a cross-section of 19 construction contractors, and the results were analysed using frequency distribution. The results show that the most frequently used methods of risk identification are the top-down approach techniques, where the project is analysed from an overall point of view. Techniques based on top-down approach lead to guesswork in terms of contingency for risks accepted by the construction contractors. Bottom-up risk identification techniques are not popular except for a questionnaire and checklist approach. Also, it was unlikely that the contractors would discussrisk allocation with the clients. All the contractors interviewed agreed that when a risk identification process is followed it improves the accuracy of their estimates.

Bowles, G, Dagpunar, J S and Gow, H (1997) Financial management of planned maintenance for housing associations. Construction Management and Economics, 15(04), 315-26.

Chau, K W (1997) Note - The ranking of construction management journals. Construction Management and Economics, 15(04), 387-98.

Fenn, P (1997) Note - Rigour in research and peer review. Construction Management and Economics, 15(04), 383-5.

Griffith, A and Headley, J D (1997) Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management and Economics, 15(04), 341-8.

Hatush, Z and Skitmore, M R (1997) Assessment and evaluation of contractor data against client goals using PERT approach. Construction Management and Economics, 15(04), 327-40.

Punwani, A (1997) A study of the growth-investment-financing nexus of the major UK construction groups. Construction Management and Economics, 15(04), 349-61.

Songer, A D, Diekmann, J E and Pecsok, R (1997) Note - Risk analysis for revenue dependent infrastructure projects. Construction Management and Economics, 15(04), 377-82.

Tse, R Y C and Ganesan, S (1997) Note - Causal relationship between construction flows and output: evidence from Hong Kong. Construction Management and Economics, 15(04), 371-6.